CATE (Client Adjustable Testing Environment)

CATE is our Client Adjustable Testing Environment, which gives you the power to test the way that works best for you. CATE’s flexibility gives you numerous options to control the way you review your survey instrument, including: Change a previous answer without having to back up, allowing you to test multiple paths quickly “Branch” your…

Types of Links

The links for your project are accessible 24/7 through the Project Details tool in JUMP. Once in Project Details, these can be viewed by going to the Links page (in the blue menu on the left of the screen). Your project manager will notify you when new links are available for your project. Different stages…

Best Practices for Questionnaire Documents

A Guide for Quicker Programming and Changes 1. Autonumbering: Turn off autonumbering and autolettering in the Word documents. This is key so that the numbers and letters do not change in the document. Programming is based on the original information and changing existing numbers and letters can be very problematic and slow down the process.…

QA Note Tool – User Instructions

Testing of survey programming is an important part of making sure that logic is functioning as intended.  With complex logic and potentially numerous paths to follow, this process can often be time consuming.  The QA Note Tool was created to hopefully assist with the review process, reducing the required time by providing a systematic method…